Bambarabotuwa II Mini Hydro Power Project was commissioned in 2013 & it is fed by Bambarabotuwa Oya located in Ratnapura. The capacity of this power plant is 3.0 Mw.
Capacity
3.0 Mw
Design Flow
5500L/S
River Catchment
Bambarabotuwa Oya
Effective Catchment Area
17.8km²
Head
87m
Channel Length
2500m
Av. Plant Factor
23%
Penstock Length
330m
Commissioned
2013
Turbine Type
Fransis