Bambarabotuwa III MHPP

Bambarabotuwa III Mini Hydro Power Project was commissioned in 2012 & it is fed by Bambarabotuwa Oya located in Ratnapura. The capacity of this power plant is 4.0 Mw.

Projects Details

Capacity

4.0 Mw

Design Flow

3000L/S

River Catchment

Bambarabotuwa Oya

Effective Catchment Area

10.9kmĀ²

Head

204.8m

Channel Length

990m

Av. Plant Factor

26%

Penstock Length

954m

Commissioned

2012

Turbine Type

Pelton

View of the Project Field

Other Projects

Wey Ganga MHPP

Ratnapura

10.5 Mw

Barcaple I MHPP

Kandy

2.0 Mw

Barcaple II MHPP

kandy

4.0 Mw

Gampalawelakada MHPP

Ratnapura

4.2 Mw

Guruluwana MHPP

Ratnapura

2.0 Mw

Nakkawita MHPP

Kegalle

1.3 Mw

Pathaha Oya MHPP

Badulla

1.5 Mw

Bambarabotuwa II MHPP

Ratnapura

3.0 Mw

Bogandana MHPP

Badulla

5.0 Mw

Falcon Valley MHPP

Kandy

2.4 Mw

Thannewatta MHPP

Badulla

1.0 Mw

Kalupahana Oya MHPP

Badulla

2.5 Mw