Capacity
1.3 Mw
Design Flow
22m3/S
River Catchment
Magal Ganga
Effective Catchment Area
155.27km2
Head
6 M
Channel Length
440m
Commissioned
2004
Turbine Type
Kaplan
10.5 Mw
2.0 Mw
4.0 Mw
4.2 Mw
2.0 Mw
1.5 Mw
4.0 Mw
3.0 Mw
5.0 Mw
2.4 Mw
1.0 Mw
2.5 Mw