Barcaple I MHPP

Barcaple I Mini Hydro Power Project was commissioned in 2008 & it is fed by Inguru Oya located in Kandy. The capacity of this power plant is 2.0 Mw.

Projects Details

Capacity

2.0 Mw

Design Flow

2.6 m3/s

River Catchment

Inguru Oya

Effective Catchment Area

16 kmĀ²

Head

102m

Channel Length

680m,1140m

Av. Plant Factor

37%

Penstock Length

290m

Commissioned

2008

Turbine Type

Turgo Impulse

View of the Project Field

Other Projects

Wey Ganga MHPP

Ratnapura

10.5 Mw

Barcaple II MHPP

kandy

4.0 Mw

Gampalawelakada MHPP

Ratnapura

4.2 Mw

Guruluwana MHPP

Ratnapura

2.0 Mw

Nakkawita MHPP

Kegalle

1.3 Mw

Pathaha Oya MHPP

Badulla

1.5 Mw

Bambarabotuwa III MHPP

Ratnapura

4.0 Mw

Bambarabotuwa II MHPP

Ratnapura

3.0 Mw

Bogandana MHPP

Badulla

5.0 Mw

Falcon Valley MHPP

Kandy

2.4 Mw

Thannewatta MHPP

Badulla

1.0 Mw

Kalupahana Oya MHPP

Badulla

2.5 Mw