Thannewatta MHPP

Thannewatta Mini Hydro Power Project was commissioned in 2018 & it is fed by Mathotilla Oya located in Badulla. The capacity of this power plant is 1.0 Mw.

Projects Details

Capacity

1.0 Mw

Design Flow

6.0 m3 / Sec

River Catchment

Mathotilla Oya

Effective Catchment Area

84kmĀ²

Head

18m

Channel Length

2285m

Penstock Length

90m

Commissioned

2018

Turbine Type

Francis

View of the Project Field

Other Projects

Wey Ganga MHPP

Ratnapura

10.5 Mw

Barcaple I MHPP

Kandy

2.0 Mw

Barcaple II MHPP

kandy

4.0 Mw

Gampalawelakada MHPP

Ratnapura

4.2 Mw

Guruluwana MHPP

Ratnapura

2.0 Mw

Nakkawita MHPP

Kegalle

1.3 Mw

Pathaha Oya MHPP

Badulla

1.5 Mw

Bambarabotuwa III MHPP

Ratnapura

4.0 Mw

Bambarabotuwa II MHPP

Ratnapura

3.0 Mw

Bogandana MHPP

Badulla

5.0 Mw

Falcon Valley MHPP

Kandy

2.4 Mw

Kalupahana Oya MHPP

Badulla

2.5 Mw