Bogandana Mini Hydro Power Project was commissioned in 2009 & it is fed by Weli oya located in Badulla. The capacity of this power plant is 5.0 Mw.
Capacity
5.0 Mw
Design Flow
6.9 m3 / Sec
River Catchment
Weli oya
Effective Catchment Area
89km²
Head
92m
Channel Length
3928m
Av. Plant Factor
26%
Penstock Length
258m
Commissioned
2009
Turbine Type
Francis
Ratnapura
10.5 Mw
Kandy
2.0 Mw
kandy
4.0 Mw
4.2 Mw
Kegalle
1.3 Mw
Badulla
1.5 Mw
3.0 Mw
2.4 Mw
1.0 Mw
2.5 Mw